Great West House

Great West House

Project Info:

London, UK
Active Multiservice

Given the low slab to slab height at Great West House was a key driver for the clients choice of Frenger’s “Slim Line” Active Multiservice Chilled Beams (MSCB’s). For this project Frenger pre-fabricated their MSCB’s to be only 150mm deep and to provide in excess of 600 watts waterside cooling per meter with minimum fresh air for the respiratory requirements of the occupants to enable the most energy efficient air conditioning solution. Frenger integrated LED lighting to provide energy savings and long life expectancy in addition to that of their “Slim Line” Active Chilled Beams “Compact®”. The building was awarded BREEAM “Very Good” and the offices are considered Grade A.

Project Images: